Approval is difficult when two legitimate sources disagree
The later note may represent a correction, an option, or a misunderstanding. Selecting it solely because it is newer turns chronology into an authority rule that the documents may not support. The review should compare the two format statements, identify who made them, and show whether any explicit supersession or approval exists. The project owner can then decide whether spreadsheet delivery replaces PDF, supplements it, or remains a proposal. Each interpretation has different scope and acceptance consequences. The evaluation should include a note that clearly replaces the old format and another that only asks about an alternative. Identical file dates should not prevent the first from being understood, and a later timestamp should not make the second binding. Keeping the disagreement visible allows useful project preparation to continue without concealing the decision that still needs to be made.
Working through the example
A signed scope requests PDF reports, while later meeting notes mention spreadsheet delivery. Both appear credible, but the notes do not explicitly replace the scope. Present both references and the precise format conflict. Ask the authorized owner to decide which condition governs before changing the approved candidate.
A discriminating check
Inspect whether the project draft exposes the disagreement rather than selecting the most recent file automatically. Recency is relevant context, not proof that one source supersedes another. The traceability sources motivate preserving decisions and their supporting relationships. Binding approval to a particular revision is an explicit project design rule, rather than a research performance claim.